NATIONAL POWER EQUIPMENT

MA Puffer Tube

Replacement puffer tube for medium voltage breakers such as MA 250/350. Priced per tube.
$173.25

MA/SE Shaft Bushing

MA shaft bushing for 5kv SE mechanisms (not 515).
$21.00

Masterpact Lift Bracket (Narrow)

Lifting bracket used with overhead crane for removing and installing Square D Masterpact NW08, NW16, NW20, NW32, (N1, H1, H2) 800-3200A breakers. W-frame 15.75 inches.
$630.00

Masterpact Lift Bracket (Wide)

Lifting bracket used with overhead crane for removing and installing Square D Masterpact NW20, NW32, NW40, NW50 (H2, L1) 2000-5000A breakers. Y-frame 31.00 inches.
$656.25

MDS Racking Handle

Racking handle for removal and installation of breakers.
$321.30

MPC Switch Cover

Phase cover for MPC switch.
$525.00

MVT Ground Defeat Cable

Ground defeat cable used for testing GE MVT type trip units.
$346.50

MVT+ Communication Plug

Communications plugs with pins for General Electric MVT+ solid state trip systems.
$132.82